• Return Home
  • energy staru.s. green building council
Page Header
Page Title
 
 
Category:  Search for:     
 

How soon can the walls be backfilled after installation?

Print FAQ      Email FAQ

Question:

How soon can the walls be backfilled after installation?

Answer:

To comply with building code requirements, the wall must be supported at both the top and bottom of the wall prior to the placement of backfill. This means that the framing/decking connection at the top of the wall must be completed and the floor slab at the bottom of the wall must be installed prior to backfilling.

Related Documents:

  • MAN 42-9000 BGB Revised June 2010 Download

Related Subject:

Previously Viewed Questions:

 Back to Search Results

“If you have additional questions, please feel free to contact us, we would love to hear from you.  It is typically most beneficial to speak directly with your local Superior Walls Representative concerning the market where your project is located.  You can find their contact information by using the “Rep Locator” map.  Your local Superior Walls Representative will always be happy to assist you in answering your questions.”
design professionals

tech resources